  • Adjusted EBITDA -- $185.3 million, up 27.8% from $145.0 million in the previous quarter and up 70.3% from $108.8 million in the third quarter of 2025.
  • Total Revenue -- $532.4 million, representing 157.6% year-over-year growth from $206.7 million due to increased spot prices and the inclusion of fuel cost components.
  • Spot Revenue -- $218.6 million, reflecting natural gas, LNG, and liquid fuels purchased directly for spot generation.
  • Total Generation -- 4,791 gigawatt hours, representing approximately 13.6% of the total generation on the grid in Argentina.
  • Nine-Month Capital Expenditures -- $458.6 million, including progress on battery energy storage projects and major maintenance works.
  • Net Financial Leverage -- 0.72x adjusted EBITDA, decreasing from 1.2x in the second quarter.
  • Net Financial Debt -- $343.7 million, calculated as $681.5 million in total debt minus $337.8 million in cash and financial assets.
  • Natural Gas Supply -- 2 million cubic meters per day, secured through a direct supply agreement with Pluspetrol running through December 2028.
  • Renewable Generation -- 469 gigawatt hours, increasing 8.4% from the second quarter following the acquisition of the Cafayate and San Carlos solar farms.
  • Energy Sales -- $509.5 million, accounting for 95.7% of total revenue for the quarter.
  • Adjusted EBITDA Guidance -- $500 million to $550 million for the full year 2026.
  • Battery Project Contribution -- $25 million to $27 million, expected to be added to consolidated adjusted EBITDA in 2027.
  • Storage Project Completion -- 81% at Central Puerto and 87% at Central Costanera, with 82% of total project capital expenditures already executed.
  • RIGI Capital Commitment -- $240 million, required over the next two years for the Aguada del Chivato and Aguada de Bocarey blocks to qualify for the regime.
  • Maintenance Expenditures -- $40 million for the major overhaul of the GT #9 unit at Central Costanera.
  • Fuel Self-Procurement -- 55.3% of total fuel consumption, increasing from 37.2% in the second quarter.
  • Contracted Revenues -- $219.7 million, representing 43% of energy sales compared to 51% in the prior quarter.
  • Hydro Output -- 93.6% year-over-year increase at Piedra del Aguila, driven by improved hydrological conditions.
  • Generation Volume Change -- 5.2% decrease from the second quarter, reflecting programmed maintenance at Central Puerto and Central Costanera.
  • Notes Issuance -- $94.3 million in Class E notes issued in July and $50.0 million in Class F notes issued in October.

Need a quote from a Motley Fool analyst? Email pr@fool.com

RISKS

  • Bonnet stated, "the inflows coming from the Collón Cura River and the Limay River that are in the third quarter was very, very high, and we are seeing that they are reducing right now," noting a potential impact on future hydroelectric generation.
  • Bonnet warned that fourth quarter adjusted EBITDA would likely decrease to between $75 million and $80 million, stating, "we have a big maintenance program maintenance in our Costanera combined cycle, more or less 60 days of maintenance on one GT and 30 days of maintenance, the other one."

SUMMARY

Central Puerto S.A. (NYSE:CEPU) reported sequential growth in adjusted EBITDA and revenue for the third quarter, driven by the capture of margins on self-procured fuels and seasonal winter spot prices. Management reported a strategic transition to the U.S. dollar as the functional currency while advancing expansion into the oil and gas sector through the acquisition of Vaca Muerta assets. The company stated that capital allocation remains focused on completing battery energy storage projects and maintaining a disciplined balance sheet, with net financial leverage falling to 0.72x. Management confirmed full-year 2026 guidance and indicated that future growth will depend on organic developments, government asset privatizations, and potential capacity auctions.

  • The company signed the first direct natural gas supply agreement of its kind with Pluspetrol to withdraw volumes from the CAMMESA pool through 2028.
  • Management reported that civil works for battery storage projects are complete, and the units are expected to be the first of their kind to reach commercial operation in the region.
  • CEO Bonnet noted that reaching the 60% thermal contracting limit will be difficult without new regulations regarding the pass-through of contracts to the demand side for distribution companies.
  • The company is preparing documentation for the RIGI incentive regime for its Aguada del Chivato and Aguada de Bocarey blocks.
  • The Neuquén province awarded the Corralera Noroeste block to the company's subsidiary, PESA, which involves a four-year exploration agreement.
  • Management stated that the major maintenance intervention for the GT #9 unit at Central Costanera includes upgrading hot parts to extend the next major service interval until 2029.

INDUSTRY GLOSSARY

  • CAMMESA: The company responsible for managing Argentina's wholesale electricity market and grid operations.
  • Combined Cycle: A power generation system that uses both a gas turbine and a steam turbine to increase efficiency.
  • GWh: Gigawatt hours, a unit of energy equivalent to one million kilowatt hours.
  • MAT: Mercado a Término, the market where large users in Argentina contract electricity directly from generators.
  • Plan Gas: An Argentine government program designed to incentivize domestic natural gas production.
  • PPA: Power Purchase Agreement, a long-term contract for the sale of electricity between a generator and a buyer.
  • RIGI: Regimen de Incentivo para Grandes Inversiones, an Argentine regulatory framework offering tax and customs benefits for large-scale investments.
  • Vaca Muerta: A major shale formation in Argentina containing significant unconventional oil and gas reserves.

Full Conference Call Transcript

Operator: Good morning, ladies and gentlemen. Welcome to Central Puerto's Third Quarter of 2026 Earnings Conference Call. A slide presentation is accompanying today's webcast and will be also available on the Investors Section of the company's website, www.centralpuerto.com/en/investors. [Operator Instructions]. Please note this event is being recorded. If you do not have a copy of the press release, please refer to the Investor Relations Support section on the company's corporate website at www.centralpuerto.com. In addition, a replay of today's call will be available in upcoming days by accessing the webcast link at the same section of the Central Puerto's website. Our host today will be Mr. Fernando Bonnet, Central Puerto's CEO; Mr. Enrique Terraneo, the company's CFO; Mrs.

Maria Laura Feller, Head of Investor Relations; and Mr. Osvaldo Cado, our Finance Manager; and Mr. Alejandro Diaz Lopez, Head of Corporate Finance. Maria Laura please go ahead.

Maria Feller: Good morning, everyone, and thank you for your time today. We'll cover our third quarter results, and then we will take your questions. As always, please keep in mind the disclaimer on Slide 2 regarding forward-looking statements and non-IFRS measures, including adjusted EBITDA. Also, as a reminder, since January 1 of this year, our functional currency is the U.S. dollar rather than the Argentine Peso and we have refined how we convert historical peso figures into dollars. You'll find the full detail in Note 2.2 to our financial statements. All figures are in U.S. dollars unless otherwise stated. Let's turn to Slide 3 for the highlights of the quarter. Third quarter adjusted EBITDA came in at $185.3 million.

That's up 27.8% from the $145.0 million achieved in the second quarter and up 70.3% versus the $108.8 million in the third quarter of 2025. Adjusted EBITDA for the first 9 months of the year reached $451.0 million, and our last 12 months adjusted EBITDA stands at $480.3 million. Revenues totaled $532.4 million, up 17.4% quarter-on-quarter from $453.3 million and up 157.6% year-on-year from $206.7 million. This figure includes $218.6 million of spot revenues related to self-procured fuel. Total generation reached 4,791 gigawatt hours, representing approximately 13.6% of total generation on Argentina's grid in the quarter.

Our asset generation decreased 5.2% from the second quarter's 5,055 gigawatt hours and a 5.6% increase versus the 4,539 gigawatt hours generated in the third quarter of last year. Such effect was explained by program maintenance works in Central Puerto and Central Costanera assets. On the investment side, capital expenditures were $36.7 million in the quarter and $458.6 million for the first 9 months of 2026. That includes a progress made during the quarter in our battery energy storage projects, which are expected to be completed in the following months and maintenance works. Our balance sheet continued to show strength with a net financial leverage of 0.72x adjusted EBITDA from 1.2x last quarter with net financial debt of $343.7 million.

On the commercial front, on October 1, we signed the first direct natural gas supply agreement of its kind in the sector. Together with Pluspetrol, we became the first nonintegrated companies to withdraw planned gas volumes from the CAMMESA pool. The agreement will run through December 2028, the end of the current Plan Gas program for 2 million cubic meter per day, represents approximately half of the gas needed for the average daily operations of the Central Puerto complex. Briefly on the total market demand in this quarter was 36.7 terawatt hours, up 3.8% quarter-on-quarter and 4.1% year-on-year, driven mainly by residential demand, which grew 7% versus the second quarter. Also in this quarter, the generation mix shifted.

Hydro generation increased 35.2% quarter-on-quarter on better hydrological conditions, while thermal generation declined 15.7%. Gas volumes under the Gas Acuerdo program fell during the winter months and were compensated by fuels procured directly by generators. Regarding Central Puerto, our total generation was 4,791 gigawatt hours, compared to the second quarter, we had lower thermal dispatch at some Central Puerto and Central Costanera assets, which underwent scheduled maintenance and was partially offset by higher output at Brigadier Lopez, San Lorenzo, Piedra del Águila and the renewables. Year-on-year, Piedra del Aguila nearly doubled its output, up 93.6%. And Brigadier Lopez added 371 gigawatt hours as its new combined cycle ramped up. Our renewables generated 469 gigawatt hours, up 8.4% quarter-on-quarter.

With the Cafayate and San Carlos new solar farms, revenues were $532.4 million, up 17.4% quarter-on-quarter and 157.6% year-on-year. Energy sales were $509.5 million, representing 95.7% of the total. Spot thermal revenues were the main driver, reaching $289.8 million, up 35% quarter-on-quarter and 192.2% year-on-year. Such increase is explained by higher seasonal marginally system prices during the winter months and the fuel cost component that is reflected in revenues when we self-procure fuel for spot generation. In the third quarter, this included approximately $218.6 million of natural gas, LNG and liquid fuels purchased directly compared to $182.8 million in the second quarter.

When CAMMESA supplies the fuel under the Gas Acuerdo program, that cost is managed by CAMMESA and therefore, is not recognized as revenue by the company. Contracted revenues totaled $219.7 million. And within that figure, thermal MAT and PPA revenues were $167.3 million, renewables $29.8 million and Hydro, $22.5 million. As Spot revenues grew faster with self-procured fuel component, contracted revenues represented 43% of energy sales compared to 51% last quarter. Adjusted EBITDA was $185.3 million, up 27.8% quarter-on-quarter and 70.3% year-on-year with a margin of 34.8% compared to 32% last quarter. Because our revenues now include the fuel cost component of self-procured fuel, margins are not directly comparable to last year.

The improvement was mainly driven by the margin capture on self-procured fuels and seasonal winter spot prices, together with higher volumes from all 3 PPA thermal assets, including the new Brigadier Lopez combined cycle and from Piedra del Aguila on better water resources. The solar farms we acquired, Cafayate and built San Carlos in 2025 added further volume. Self-procured fuel reached 55.3% of our total fuel consumption in the third quarter, up from 37.2% in the second quarter and 18.1% in the first. That is an average of almost 4 million cubic meters per day of gas equivalent out of $7.2 million in total.

Our adjusted EBITDA for the first 9 months of the year was $451.0 million, and we are on track to reach our full year guidance of $500 million to $550 million. Capital expenditures for the quarter were $36.7 million and $458.6 million for the first 9 months. Of that amount, $108.9 million corresponds to the battery storage projects. Regarding such projects, all civil works are complete and the battery containers have been installed. Construction is 81% complete at Central Puerto and 87% at Central Costanera and 82% of the total project CapEx has already been executed. Our projects are expected to be the first to reach commercial operation among all the projects under the AlmaGBA and AlmaSADI programs.

Once operational, we expect these projects to contribute between $25 million and $27 million to our consolidated adjusted EBITDA in 2027. On oil and gas, we continue to work with the Neuquén provincial authorities on the same process for the Aguada del Chivato and Aguada de Bocarey blocks, and we are preparing the documentation for our RIGI presentation. In addition, on October 21, the province awarded the Corralera Noroeste block to our subsidiary, PESA. As of September 30, our total outstanding financial debt was $681.5 million against cash, cash equivalents and financial current assets of $337.8 million. That leaves us with net debt of $343.7 million.

Additionally, our last 12 months adjusted EBITDA was $480.3 million, and that is how our net leverage ratio was 0.72x the adjusted EBITDA. In the quarter, in July, we issued the Class E notes for $94.3 million. And after quarter end, on October 6, we issued the Class F notes for $50.0 million. Thank you very much for your time and for your continued confidence in Central Puerto. I will now hand over for the Q&A, and then our CEO will share his closing remarks.

Operator: [Operator Instructions]. Our first question comes from Guilherme Lima with Santander.

Guilherme Lima: I have 2 quick questions here. First, if you could comment on the full year EBITDA expectations as you wrote in the earnings release, you were expecting around USD 500 million and $550 million. Just wanted to understand what are your expectations for the first -- for the fourth quarter comparing to the last year fourth quarter, as last year the EBITDA was around $100 million, if I'm not mistaken. If you just could comment on what you are seeing for the last quarter of the year and your expectations for the full year EBITDA in 2026. And the other question is related to capital allocation. We saw leverage decrease to around 0.7x net debt to EBITDA.

If you could just comment on the opportunities you are seeing for this low level of leverage and if we should expect a recurring dividend for the 2027? That's it.

Fernando Bonnet: Thank you for your question. Going to the first one, talking about the expectation of the projected EBITDA. As we mentioned, we are seeing something around $500 million and $550 million depending on the dispatch of the units, the hydro levels, the inflows coming from the Collón Cura River and the Limay River that are in the third quarter was very, very high, and we are seeing that they are reducing right now. And the consumption -- the fuel consumption that we are not expecting liquid fuels for this final quarter and the dispatch of our units. So comparing to the last year, I think we will be more or less similar. We have more contracts today.

But in the other hand, we have a big maintenance program maintenance in our Costanera combined cycle, more or less 60 days of maintenance on one GT and 30 days of maintenance, the other one. So the EBITDA it will be reduced that $100 million that you mentioned will be perhaps between $75 million, $80 million and depending, as I mentioned, of the inflows from Piedra del Aguila, the inflows and the dispatch of the steam turbines that are very sensitive to the temperatures. Right now, we are not -- we are seeing the dispatch of the TB6 and TB9 from Central Puerto that were out of dispatch since end of August.

So we are right now seeing a ramp-up of temperature. So it could be increased our EBITDA a little bit depending, as I mentioned, on the temperature. So we can see in the range of $75 million, $80 million and could be $90 million if the temperature goes up higher than we are seeing right now. Moving to the second one, the ratio of the leverage ratio, as you mentioned, we are reducing that for increasing of EBITDA. So this gives you a full flexibility to enter a new acquisition. We are seeing opportunities on the selling the government assets, talking about the Hydro and the Thermal units that the government is planning to sell and other opportunities to acquire.

We are looking for to acquire organic opportunities of growth. Talking about dividends, we are not -- this will be the decision of the shareholders' meeting. We are not seeing -- as I mentioned, depending on the growing opportunities, we will perhaps advise to the Board some dividends, but that will depend on the opportunities that we see, as I mentioned, acquisition of new assets and new developments, organic development.

Operator: Our next question comes from Tomas Perrochin with Balance.

Tomas Perrochin: Congrats on the results. Regarding fuel self- procurement, we have seen that you are making progress with self procurement. As we understand, to get an [ F1 ] in the spot market, you also need firm gas transportation capacity. Do you think you will be able to secure enough firm transportation capacity to cover 100% of your thermal fleet? And regarding the Pluspetrol agreement, could you give us some color on the average price you are paying compared to the Plan Gas?

Fernando Bonnet: Okay. Going to the first question, first, thank you for your question. Going to the first one. I don't see easily to cover 100% of our gas capacity with firm transportation. Right now, we have -- we acquired transportation from TGS around 400 cubic meters. And we expect to -- and we are analyzing the opportunity to enter in the TGN new pipeline that goes for -- mostly for the center of the county and the north. So we are advising that for the San Lorenzo plant and the [ Brigadier Lopez ] plant and in some cases, some for Buenos Aires area.

But with the TGS and TGN, I think we could benefit from the liberation of the transportation of CAMMESA that will come to us sooner or later. So I don't see the need to have 100% of our capacity contracted because the fluctuation of the production of the combined cycle right now are not easily to predict or not, I think, well fit to have 100% contracted with the prices that we are seeing of this transportation. But at the end of the day, I'm assuming that in the near future with TGS and TGN, we can at least reach the level of between 40%, 50% of our capacity, efficient thermal capacity contracted.

So to your -- going to your second question, the price that we have with the Pluspetrol is the same price that Pluspetrol has with the Plan Gas is between $2.7 and $4.1 depending on the dollar per million cubic meter and depending on winter time on summer time. It's the same price that Pluspetrol has at the Plan Gas.

Tomas Perrochin: Okay. Very clear. So my second question is regarding the updates on the recent changes from the Secretary of Energy, especially the increase in the contracting limit to 60% for existing spot thermal starting in April 2027. How is that going for you? How much you have already contracted? And how do you expect that to evolve in 2027? And just a quick one regarding the Circa capacity auction that is taking longer than expected. Do you have some information there and also in the privatization process?

Fernando Bonnet: Going to the first one, we -- right now, we reached the limit of 20% that the former regulation established, and we are looking for to increase that for sure, for the next year. Reaching the 60%, we are seeing that difficult without entering a contract with the distribution companies.

I think we could reach perhaps 10%, 15% more in the next perhaps coming quarters, but reaching the 60% of our thermal capacity, we will need to enter in a contract with distribution companies that are, as you know, or requires additional regulation in terms to mainly pass-through of those contracts to the demand, and that's required for federal regulation and for the rest of distribution companies, a provincial regulation, local regulations. In order to, as I mentioned, to have this pass-through directly to the demand working without the delays that they need to have right now, going every contract they signed to this new scheme and requires, as I mentioned, perhaps automatic scheme that are not set right now.

So we expect to increase, but to reach the levels of the new regulation will require time and new regulation for distribution companies. And the last one, talking about circa I don't know, we talk every week with the authorities, and they are working in order to have this process established at least at the end of the year and try to move forward at the beginning of the next one. But I don't know, we don't have a certain time line for that. We expect to -- if not end of this year, we expect for the first quarter next one. And the same of privatization.

We are talking every week and they say that they are ready to launch, but they still have some approvals and some paperwork. But we don't have also a clear time then.

Tomas Perrochin: Okay. And my last question is on the oil and gas side, how is the process of building your team going? You mentioned that you are preparing the RIGI application. Could you share a bit more about your development plans for the blocks, especially the expected time line for the exploration activities?

Fernando Bonnet: Well, as you mentioned, we are building the team. We are stronger. We are stronger in the team every day. So we are setting the challenge or the most important position and are challenging right now. And in terms of RIGI, we are working very hard with the lawyers and all the team in order to have all the documentation ready to present or to apply to RIGI as soon as possible. So we are expecting the end of this year or the beginning of the next one when we have all information ready. In terms of exploration, first, as I mentioned, we need to reach the for Aguada del Chivato and Bocarey.

And then we are expecting to move forward perhaps first quarter next year or early second quarter next year.

Operator: Our next question comes from Matt [indiscernible]..

Unknown Analyst: Congratulations on another good set of results. My question is on the oil and gas side. So you reported some CapEx disbursements of some $55 million in the results yesterday. I was just wondering if you could share some color on what that was for, specifically if it was still payment for Aguada del Chivato and Bocarey or any other exploration expenses that you may have incurred. Also still on the oil and gas side, if you could share any preliminary CapEx expectations for Q4 and next year?

And lastly, we already saw GeoPark come out with some draft development plans for the block that they bought, which is neighboring to yours, and it's also a block of the same size. And their development points to a potential production of 50,000 barrels per day. I know it's still early to gauge the potential on any of the blocks, but I was just sharing if you're thinking of something in that magnitude. And if that was the case, if you would be willing to bring a partner to help you develop that block? Yes, those would be my questions.

Fernando Bonnet: Okay. Thank you for your questions. Talking about the expenditures that you mentioned, this was the decision of the block and not yet any development ready in that area was the acquisition of the Aguada del Chivato and Bocarey at cost. And as we talked earlier, we are planning to present -- we're working hard to present the central requirement and the RIGI for end of this year, early first quarter. And then after that, we are planning to enter in an exploration phase for Aguada del Chivato and Bocarey and then as if we enter a RIGI regime, we need to spend at least $240 million in the next 2 years.

So this was more or less the capital expenditure that we expect for the areas. And talking about Corralera, as you mentioned, it's very, very early stage to say what the possible or the potential of the area are. But as you mentioned, if everything goes as we expect and the implementation information that we saw when we evaluate the area goes well, it will be more or less the same possible production, as you mentioned, of GeoPark are expected. So we are seeing more or less in the situation that we confirm all the information that we saw would be some less as we mentioned, that level of production whenever it was fully developed.

So for Corralera, it's an earlier stage than Chivato. So we signed an agreement for exploration with the Neuquén oil company. And we have an agreement for -- to drill 2, 3 wells in 4 years to develop all the -- to derisk all the area. So we are planning to enter in that exploration phase next year. And then after that, we will see if we need to -- if we can go to exploitation phase and to move forward to an exploitation phase with the same as we expect on the Chivato..

Unknown Analyst: Okay. And just to follow up, and you would be willing to look into partnering with an operator to develop Corralera and potentially also Chivato and Bocarey?

Fernando Bonnet: No. No, in fact, we are developing our own resources. We have an agreement with a very well-known company that work for -- in U.S. and in Permian that is Radius Energy, and they are working with us in order to develop and to operate the areas by ourselves.

Operator: Our next question comes from Martin Arancet. Could you give us more color on the 4Q '26 major maintenance at Central Costanera? If I'm not mistaken, when did you have the last major maintenance on the asset? And how much CapEx would this major maintenance require?

Fernando Bonnet: Okay. Thank you, Martin, for your question. The previous major maintenance was in 2000. The previous year was a big maintenance on the GT #8 and the boiler was a big intervention of the boiler that this unit never has. So the boiler was at the original stage or we did a major intervention of the boiler and the GT #8. And this time was the time for the GT #9 intervention of the intervention. So we changed the hot parts of the steam turbine. We made an upgrade of the hot parts of the steam turbine -- sorry, of the gas turbine. And we don't expect a new intervention for this unit until 2029.

And the CapEx around that was around $40 million.

Operator: Our next question comes from Jamiro Guerrero. Congratulations on the results. What CapEx should we expect for fourth quarter and for 2027? And on the Costanera combined cycle overhaul, how much will it cost? And how long will the unit be offline?

Fernando Bonnet: Well, talking about the electricity part, we are finishing our base battery system storage project and at the end of this year, at the beginning of the next quarter. So in that sense, we are not expecting new growing CapEx at least until that we don't see the new internal auction. So that will depend on if we get awarded on that auction or not. But right now, we are finishing the expansion CapEx of the storage system projects. So we are not expecting additional ones, as I mentioned, aside from new awarding of the circa capacity auction.

And talking the normal maintenance will be, as I mentioned, we are not expecting big maintenance of the units, so will be the regular maintenance CapEx. And in oil sector, as I mentioned, if we enter a RIGI scheme, we will see that $240 million in these 2 next years, perhaps separating the half year and year. And that's aside from acquisitions and new awarding project, this will be more or less how the CapEx will be.

Operator: Thank you. We have a couple of questions from Alejandro Christensen with Latin Securities. How much of second Q '26 and third Q '26 EBITDA came from margins on self-procured LNG and liquids? Do the new CVP caps reduce that margin going forward? In your view, what's the government intention in accelerating contracting for legacy units and moving liberalization up to 2029? Do you expect MAT B2B contract prices to come down? Can you give guidance on contract prices per megawatt, including fuel? What's the drilling time line and deadline for the Corralera Noroeste commitment and the plan at PESA. Would you consider a partner farm down or selling the acreage once it's derisked?

Fernando Bonnet: Well, a lot of questions going one by one. Talking about the fuel margin or the fuel earnings, the full year were around between $7 million and $75 million. We are not expecting a reduction talking about the Resolution 293. In fact, the margin will be reduced, but we are expecting to bring online the TGS transportation that we acquired. So that gives us an opportunity to make more margin in terms of FR regulation. So that will be compensated the reduction and also the agreement that we reached with Pluspetrol.

So I think this reduction of margin that's coming from the Resolution 293 will cover for the increase of margin coming from the self-procure gas with Pluspetrol and others that we are expecting to enter in new agreements and the additional margin that we would capture having a firm transportation coming from TGS, so we expect more or less a compensation around that. And for sure, depending the final number for the next year will depend on how cold the winter come and how much LNG that we can use and procure. Going to the other one, what the government -- what is the government intention in accelerating the contractualization.

I think one big point for -- a big topic for the government is the spike in prices that the spot consumers, especially commercial consumers and small industries, consumers suffer or view during the winter. So they are willing to encourage new contractualization. And in the other kind of that, they need to release energy for new contractualization. The 20% is not enough to contractualize all the residential -- sorry, commercial and industrial end users. So in that sense, the government allowed to increase that we can go and try to contractualize those customers that suffer big spikes during winter. So -- but as I mentioned, reaching the 60% is higher even with those customers.

So on top of that, we need to reach -- if we want to reach that 60%, we need to go to the distribution companies and not have that regulatory issue that we mentioned in the previous questions. And the last one, I think that we already talked about it for Corralera Noroeste, we reached an agreement of 4 years of exploration with 3 wells that we need to do in order to derisk the area. And in-PESA, it is different. As you mentioned, we are not in that we are going to enter [indiscernible] directly. So that will be a different time line.

So we're expecting in PESA at the time that we are planning to establish or to set establish, as I mentioned, $240 million in the next 2 years.

Operator: Thank you very much for the answers. This concludes our Q&A session, and I would now like to turn the conference back to Mr. Fernando Bonnet for his closing remarks.

Fernando Bonnet: To wrap up, this was another quarter of strong execution for Central Puerto. We delivered solid financial results, continue to strengthen our commercial position, maintain a disciplined balance sheet and made meaningful progress across our strategic growth initiatives. Looking ahead, we are focused on bringing our battery storage project into operation on schedule, advancing to development of our newly acquired Vaca Muerta assets and pursuing new business expansion opportunities to create long-term value for our shareholders while preserving financial flexibility. I would like to thank our people for their commitment, our customer and business partners for their trust, the financial sector and our shareholders for their continued support. See you soon. Thank you for joining us today.

Operator, we can disconnect.

Operator: Thank you very much. This concludes today's presentation, and you may now disconnect.

Should you buy stock in Central Puerto right now?

Before you buy stock in Central Puerto, consider this:

The Motley Fool Stock Advisor analyst team just identified what they believe are the 10 best stocks for investors to buy now… and Central Puerto wasn’t one of them. The 10 stocks that made the cut could produce monster returns in the coming years.

Consider when Netflix made this list on December 17, 2004... if you invested $1,000 at the time of our recommendation, you’d have $338,083!* Or when Nvidia made this list on April 15, 2005... if you invested $1,000 at the time of our recommendation, you’d have $1,021,163!*

Now, it’s worth noting Stock Advisor’s total average return is 830% — a market-crushing outperformance compared to 209% for the S&P 500. Don't miss the latest top 10 list, available with Stock Advisor, and join an investing community built by individual investors for individual investors.

See the 10 stocks »

*Stock Advisor returns as of November 13, 2026.

This article is a transcript of this conference call produced for The Motley Fool. While we strive for our Foolish Best, there may be errors, omissions, or inaccuracies in this transcript. Parts of this article were created using Large Language Models (LLMs) based on The Motley Fool's insights and investing approach. It has been reviewed by our AI quality control systems. Since LLMs cannot (currently) own stocks, it has no positions in any of the stocks mentioned. As with all our articles, The Motley Fool does not assume any responsibility for your use of this content, and we strongly encourage you to do your own research, including listening to the call yourself and reading the company's SEC filings. Please see our Terms and Conditions for additional details, including our Obligatory Capitalized Disclaimers of Liability.

The Motley Fool has no position in any of the stocks mentioned. The Motley Fool has a disclosure policy.

The Motley Fool
Founded in 1993 in Alexandria, VA., by brothers David and Tom Gardner, The Motley Fool is a multimedia financial-services company dedicated to building the world's greatest investment community. Reaching millions of people each month through its website, books, newspaper column, radio show, television appearances, and subscription newsletter services, The Motley Fool champions shareholder values and advocates tirelessly for the individual investor. The company's name was taken from Shakespeare, whose wise fools both instructed and amused, and could speak the truth to the king -- without getting their heads lopped off.
Visit Fool.com for more market news More articles by this source

Tags

Stocks Mentioned

Latest Articles

Data is currently not available